Highway Tunnels

Tunnel automation is an application area with a low tolerance for error, in which ventilation, lighting, fire detection, traffic control and power distribution are integrated under a single control logic.

We have completed automation, control and electromechanical works in the İstanbul Metropolitan Municipality's Kağıthane-Piyalepaşa, Bomonti-Dolmabahçe and Sarıyer-Çayırbaşı tunnels; in the 6,500 metre Hopa-Borçka Tunnel of the 10th Regional Directorate of Highways (Türkiye's longest highway tunnel); and in the Gori and Rikoti tunnels in Georgia.

Highway Tunnels — completed works

Open in the filtered list
Highway Tunnels İstanbul Metropolitan Municipality Kağıthane – Piyalepaşa Tunnel İstanbul
Highway Tunnels İstanbul Metropolitan Municipality Bomonti – Dolmabahçe Tunnel İstanbul
Highway Tunnels İstanbul Metropolitan Municipality Sarıyer – Çayırbaşı Tunnel İstanbul
Highway Tunnels Ultra Teknoloji Gori Tunnel Georgia
Highway Tunnels Ultra Teknoloji Rikoti Tunnel Georgia
Highway Tunnels 10th Regional Directorate of Highways Hopa – Borçka Tunnel (6,500 m — Türkiye's longest tunnel) Hopa / Artvin

Tell us your needs, and we'll define the scope together.

We forward your requests to the relevant engineer on the same business day.